Skip to content

Merge pull request #566 from Backblaze/close-sqlite-connections #1206

Merge pull request #566 from Backblaze/close-sqlite-connections

Merge pull request #566 from Backblaze/close-sqlite-connections #1206

Triggered via push March 5, 2026 17:30
Status Cancelled
Total duration 1h 31m 11s
Artifacts

ci.yml

on: push
cleanup_buckets
11s
cleanup_buckets
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test (windows-latest, 3.12)
The job has exceeded the maximum execution time of 1h30m0s
test (windows-latest, 3.12)
The operation was canceled.
test (windows-latest, 3.9)
The job has exceeded the maximum execution time of 1h30m0s
test (windows-latest, 3.9)
The operation was canceled.
test (windows-latest, 3.10)
The job has exceeded the maximum execution time of 1h30m0s
test (windows-latest, 3.10)
The operation was canceled.
test (windows-latest, 3.13)
The job has exceeded the maximum execution time of 1h30m0s
test (windows-latest, 3.13)
The operation was canceled.