Skip to content

ESP32S3 I2S working #1754

ESP32S3 I2S working

ESP32S3 I2S working #1754

Triggered via push November 6, 2025 15:14
Status Failure
Total duration 1m 10s
Artifacts

pio-test.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

18 errors
build (ESP8266-Wemos-D1-R2)
Process completed with exit code 1.
build (ESP32-C3)
Process completed with exit code 1.
build (STM32F0-Bluepill-F030C8)
The strategy configuration was canceled because "build.ESP8266-Wemos-D1-R2" failed
build (STM32F0-Bluepill-F030C8)
The operation was canceled.
build (STM32F1-Bluepill-F103C8)
The strategy configuration was canceled because "build.ESP8266-Wemos-D1-R2" failed
build (STM32F1-Bluepill-F103C8)
The operation was canceled.
build (ESP32-MKS-TINYBEE)
The strategy configuration was canceled because "build.ESP8266-Wemos-D1-R2" failed
build (ESP32-MKS-TINYBEE)
The operation was canceled.
build (RP2350-PICO2)
The strategy configuration was canceled because "build.ESP8266-Wemos-D1-R2" failed
build (RP2350-PICO2)
The operation was canceled.
build (RP2040-PICO-W)
The strategy configuration was canceled because "build.ESP8266-Wemos-D1-R2" failed
build (RP2040-PICO-W)
The operation was canceled.
build (STM32F4-Blackpill-F401CC)
The strategy configuration was canceled because "build.ESP8266-Wemos-D1-R2" failed
build (STM32F4-Blackpill-F401CC)
The operation was canceled.
build (ESP32-S3)
The strategy configuration was canceled because "build.ESP8266-Wemos-D1-R2" failed
build (ESP32-S3)
The operation was canceled.
build (STM32H7-Generic-STM32H750)
The strategy configuration was canceled because "build.ESP8266-Wemos-D1-R2" failed
build (STM32H7-Generic-STM32H750)
The operation was canceled.