You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Currently only one controller is considered at once. Data associated with different controllers will not interfere (since f66390b).
Switching the current controller is possible from VisTrails's builder window, but there is no support for multiple controller in the current UI, or to move variables/visualizations between projects.
We want multiple spreadsheets per project (= vistrail). This could either be a two-level selection (project then spreadsheet), using two different tab bars (or a tree like UVCDAT?) or one level (tabs with names like "vis1.xml / sheet1", "vis1.xml / sheet2", "other_vis.xml / sheet1").
(originally TRAC#6, 2013-02-12)
comment by @remram44:
comment by @remram44:
comment by @remram44:
comment by @remram44:
The text was updated successfully, but these errors were encountered: