Skip to content

Cleaning package setup #318

Cleaning package setup

Cleaning package setup #318

Triggered via pull request July 25, 2025 19:24
Status Failure
Total duration 3m 57s
Artifacts

test.yml

on: pull_request
Matrix: Testing
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Testing (3.11)
Process completed with exit code 2.
Testing (3.9)
Process completed with exit code 2.
Testing (3.9)
The strategy configuration was canceled because "test._3_11" failed
Testing (3.12)
Process completed with exit code 2.
Testing (3.12)
The strategy configuration was canceled because "test._3_11" failed
Testing (3.10)
The operation was canceled.
Testing (3.10)
The strategy configuration was canceled because "test._3_11" failed
Testing (3.13)
The operation was canceled.
Testing (3.13)
The strategy configuration was canceled because "test._3_11" failed