Development

See the README in the standards directory for information about coding standards.

Branches

Major branches:

Master is the source of all truth

  • All branches are off Master
  • All work branches spawned directly off (current setup)
  • When a branch is ready to be tested, a Draft-PR is made to Master
  • When ready for branches to be moved into Production, a Release Candidate (RC) is spawned off Master.
  • RC is only merged to Master after release to Production

Moving from “Sprints” to “Cycles (of growth)”

  • Tickets are still broken down into “1 week work” chunks
    • “Sprint” infers that tickets need to be completed in a set span of time
    • Induces a rush to get tickets done
    • Pressure to release “good enough” vs “good”
    • Adds a bad level of competition between developers (I got this many done this sprint!)
  • “Cycle”
    • There is still a push to get them loaded onto the “next” release, but much less “do or die”.
    • Pushes the iterative mindset
    • Picking up the speed of deployments
    • Nothing can get “held back” just because one of the tickets needed more work after feedback.

New Git-Flow

  • Developers get/choose the tickets to work and spawn their working branch
  • Once ready, Draft-PR to Master
  • All branch-specific and regression testing is done then.
  • Friday
    • Release Candidate is spawned from Master
    • All working-branches that are ready are merged near end of day.
    • Final QA testing is done on the “push” branch. (Should be mostly automated)
  • Monday (assuming code has passed all tests)
    • RC is demoed to Michael Gao and Crystal.
    • If any aren’t given immediate go-ahead, they are pulled from the RC
    • By “pulled” it is meant the RC is killed, a new one created, and the approved work branches are merged to the new RC.
    • RC is pushed to PreProd for anyone to test and get ready for Push-to-Prod
  • Thursday
    • Unless there are last minute issues, RC is put on Production.
  • Tuesday
    • If there were no issues, RC is merged to Master
    • If there are issues, it is evaluated if they should be treated as an additional “BugFix” or needing full roll-back.
    • If BugFix, RC is merged to Master and new BugFix branch is spawned from Master and moved into the normal cycle.
    • If full roll-back is required, Master is Pushed to Prod and the RC abandoned.
  • Wednesday
    • Hold my beer

HotFixes are put through a sped-up version of this flow.

  • This is a work-in-evolution