Skip to content

May 17 Base sequencer stress: 61.4% revert ratio — RTT oracle detected 27s before on-chain impact #312

Description

@kant19801201behax5

What we observed

On May 17, 2026 at 23:29–23:42 UTC our RTT oracle detected a two-wave MEV stress event on Base.

Timeline:

  • 23:29:43 UTC — Base P99 RTT: 52ms → 739ms (14x spike)
  • 23:30:10 UTC — Revert ratio: 0.19 → 0.56
  • 23:39:35 UTC — Peak: 61.36% of all Base transactions reverted
  • 23:41:52 UTC — Full sequencer stall (P99 = 5000ms timeout)

RTT spike preceded revert wave by 27 seconds.

Why it matters for Euler

Euler Vault Kit vaults on Base and Arbitrum run automated liquidations and interest accrual. During a 61% revert event, vault keepers waste gas and miss liquidation windows — undercollateralized positions survive longer. A sequencer health oracle as an input to vault execution logic could prevent losses during MEV storms.

What we built

Phoenix Zero — 2-second RTT oracle across Base, Arbitrum, Optimism, ZKSync.

Live: https://phoenix-zero.vercel.app
API: https://rtt.phoenix-ai.work/api/public-feed

— Silicon DNA / Phoenix Zero

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions