Skip to content

Refactoring and testing #11

Refactoring and testing

Refactoring and testing #11

Triggered via pull request December 21, 2025 00:15
Status Failure
Total duration 2m 47s
Artifacts –

tests.yml

on: pull_request
backend-lint
19s
backend-lint
simulator-lint
12s
simulator-lint
frontend-lint
34s
frontend-lint
Matrix: backend-tests
frontend-tests
27s
frontend-tests
e2e-tests
0s
e2e-tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
backend-tests (3.11)
Process completed with exit code 1.
backend-tests (3.13)
The strategy configuration was canceled because "backend-tests._3_11" failed
backend-tests (3.13)
Process completed with exit code 1.
backend-tests (3.12)
The strategy configuration was canceled because "backend-tests._3_11" failed
backend-tests (3.12)
The operation was canceled.