Skip to content

Pep8 compliance standards in progress 5 #9

Pep8 compliance standards in progress 5

Pep8 compliance standards in progress 5 #9

Triggered via push October 10, 2025 14:58
Status Failure
Total duration 22s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 16.
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_10" failed
build (3.8)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_10" failed