Skip to content

Add greenhell lambda support #1381

Add greenhell lambda support

Add greenhell lambda support #1381

Triggered via push January 21, 2026 21:00
Status Failure
Total duration 8m 2s
Artifacts

ci.yml

on: push
Matrix: build
Matrix: ruby-integration-test
Publish Edge Build
0s
Publish Edge Build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Build (aarch64-unknown-linux-gnu)
Process completed with exit code 101.
Build (aarch64-unknown-linux-musl)
The strategy configuration was canceled because "build.aarch64-unknown-linux-gnu" failed
Build (aarch64-unknown-linux-musl)
The operation was canceled.
Build (x86_64-unknown-linux-gnu)
The strategy configuration was canceled because "build.aarch64-unknown-linux-gnu" failed
Build (x86_64-unknown-linux-gnu)
The operation was canceled.
Build (x86_64-unknown-linux-musl)
The strategy configuration was canceled because "build.aarch64-unknown-linux-gnu" failed
Build (x86_64-unknown-linux-musl)
The operation was canceled.
Build (aarch64-apple-darwin)
The strategy configuration was canceled because "build.aarch64-unknown-linux-gnu" failed
Build (aarch64-apple-darwin)
The operation was canceled.