Skip to content

Latest commit

 

History

History
23 lines (10 loc) · 567 Bytes

File metadata and controls

23 lines (10 loc) · 567 Bytes

Construction of the elevated platform

This section guides you through the different steps of building the elevated platform with its peripherals.

Construction of the platform {pagestep}

Follow the instruction to prepare the platform.

Mouse tube {pagestep}

Follow the instruction to print the mouse tube and mount it.

Headfixation {pagestep}

Follow the instruction to setup the head fixation.

Lick detection {pagestep}

Follow the instruction tfor possible lick detections.