From 4c58333ce8f25dcacd88411e5920f16371e3996b Mon Sep 17 00:00:00 2001 From: Tom Kralidis Date: Wed, 10 Jun 2026 15:50:08 -0400 Subject: [PATCH 1/4] [WIP] ET-W2IT 2026-06 updates (#15) * add text to 3.2 on additional global services and sensor centres * Change DCPC compliance to operation of a WIS2 node and refer to the WIS2 node assessment. * editorial --------- Co-authored-by: Wirt Kai-Thorsten --- manual/sections/part2.adoc | 6 +++--- manual/sections/part3.adoc | 6 +++++- 2 files changed, 8 insertions(+), 4 deletions(-) diff --git a/manual/sections/part2.adoc b/manual/sections/part2.adoc index 25096e1..7c1d099 100644 --- a/manual/sections/part2.adoc +++ b/manual/sections/part2.adoc @@ -33,7 +33,7 @@ 2.3.2.1 *The procedure for designating a DCPC shall consist of three steps:* *(1) Service offer by a potential DCPC;* -*(2) Demonstration of DCPC capabilities;* +*(2) Implementation of a WIS2 Node;* *(3) Designation as a DCPC.* 2.3.2.2 *Each DCPC shall complete the migration from WIS/GTS to WIS 2.0 in order to be designated as a WIS 2.0 DCPC centre and added to the list in Appendix C.* @@ -44,9 +44,9 @@ 2.3.3.2 *The service offer of candidate DCPCs shall then be submitted to INFCOM, which shall analyse the compliance of the candidate with the required DCPC functions and specifications and formulate a recommendation.* -2.3.4 *Demonstration of Data Collection or Production Centre capabilities* +2.3.4 *Implementation of a WIS2 Node* -2.3.4.1 *The Member offering a DCPC shall be invited to demonstrate to INFCOM the ability of the proposed centre to provide WIS services in compliance with DCPC functions and responsibilities, including communication with the Global Services. Compliance shall be demonstrated, where applicable, with respect to the real-time functions of data sharing, provision of relevant, up-to-date discovery metadata, coordination functions with the associated GISC, adherence to WIS standards, and relevant data exchange policies and access rights.* +2.3.4.1 *The Member offering a DCPC shall register a WIS2 centre identifier and follow the procedure for implementing a WIS2 Node. Compliance with the WIS2 specification is assessed by the principal GISC as described in the Guide to WIS, Volume II.* 2.3.4.2 *After the candidate DCPC has successfully demonstrated its capabilities, INFCOM shall recommend to Congress or the Executive Council that the candidate centre be approved.* diff --git a/manual/sections/part3.adoc b/manual/sections/part3.adoc index d75d506..2916b75 100644 --- a/manual/sections/part3.adoc +++ b/manual/sections/part3.adoc @@ -60,7 +60,11 @@ Note: Core data is defined in Resolution 1 (Cg-Ext(2021)). 3.2.14 Global Service components (Global Broker, Global Cache, and Global Discovery Catalogue) provide metrics about system performance and data availability. WIS nodes may also provide such metrics. Global Monitors collect these metrics and provide a view of current WIS performance and historical trends. -3.2.15 GISCs ensure the effective operation of WIS. Collectively, GISCs ensure that WIS meets the needs of all WMO programmes, activity areas, and regional associations – including optimizing the distribution of Global Service components, managing threats to the performance of WIS, and responding to incidents to restore system performance. Individually, a GISC supports data publishers and data consumers in its AoR, driving the adoption of good practices and resolving data sharing problems. +3.2.15 Additional Global Services provide value added capabilities, built atop the core Global Service components. + +3.2.16 Sensor Centres provide continuous measurement and assessment on Global Services. They can provide external feedback on Global Service functionality, performance and service levels, triggering corrective action. + +3.2.17 GISCs ensure the effective operation of WIS. Collectively, GISCs ensure that WIS meets the needs of all WMO programmes, activity areas, and regional associations – including optimizing the distribution of Global Service components, managing threats to the performance of WIS, and responding to incidents to restore system performance. Individually, a GISC supports data publishers and data consumers in its AoR, driving the adoption of good practices and resolving data sharing problems. [.small] Note: The _Guide to WIS_, Volume II provides additional information on the functions of WIS and how these functions may be implemented. From e11c40ec18ad7c5522b79878b713d02420ece918 Mon Sep 17 00:00:00 2001 From: Haddouch Hassan <103424042+hhaddouch@users.noreply.github.com> Date: Thu, 2 Jul 2026 10:52:48 +0200 Subject: [PATCH 2/4] Update procedures for NC and DCPC designations --- manual/sections/part2.adoc | 13 ++++++++----- 1 file changed, 8 insertions(+), 5 deletions(-) diff --git a/manual/sections/part2.adoc b/manual/sections/part2.adoc index 7c1d099..091bc9c 100644 --- a/manual/sections/part2.adoc +++ b/manual/sections/part2.adoc @@ -16,11 +16,12 @@ 2.2.2.1 *Each WMO Member shall notify WMO of the current name and location of each of its centres that is to be designated as an NC. INFCOM, with the involvement of the relevant regional associations and the assistance of the WMO Secretariat, shall ensure that each centre so designated has the support of a GISC, a DCPC or another NC.* -2.2.2.2 *Each NC shall complete the migration from WIS/GTS to WIS 2.0 in order to be designated as a WIS 2.0 centre and added to the list in Appendix C.* +2.2.2.2 *Each NC shall complete the migration from WIS/GTS to WIS 2.0 in order to be designated as a WIS 2.0 centre.* +2.2.2.3 The Secretariat shall maintain and publish the list of designated NCs. Each NC entry includes the name of the associated GISC. 2.2.3 *Designated National Centres* -2.2.3.1 *The NCs designated by Members shall be included in the list of WIS centres in Appendix C to this Manual. Each NC entry shall include the name of the associated GISC.* +2.2.3.1 *The Secretariat shall maintain and publish the list of the NCs designated by Members. Each NC entry shall include the name of the associated GISC.* === *2.3 PROCEDURE FOR DESIGNATING A DATA COLLECTION OR PRODUCTION CENTRE* === @@ -36,7 +37,7 @@ *(2) Implementation of a WIS2 Node;* *(3) Designation as a DCPC.* -2.3.2.2 *Each DCPC shall complete the migration from WIS/GTS to WIS 2.0 in order to be designated as a WIS 2.0 DCPC centre and added to the list in Appendix C.* +2.3.2.2 *Each DCPC shall complete the migration from WIS/GTS to WIS 2.0 in order to be designated as a WIS 2.0 DCPC centre and added to the list maintained and published by the Secretariat.* 2.3.3 *Service offer by a potential Data Collection or Production Centre* @@ -48,11 +49,13 @@ 2.3.4.1 *The Member offering a DCPC shall register a WIS2 centre identifier and follow the procedure for implementing a WIS2 Node. Compliance with the WIS2 specification is assessed by the principal GISC as described in the Guide to WIS, Volume II.* -2.3.4.2 *After the candidate DCPC has successfully demonstrated its capabilities, INFCOM shall recommend to Congress or the Executive Council that the candidate centre be approved.* +2.3.4.2 *After the candidate DCPC has successfully implemented a WIS2 Node, SC-IMT shall formulate a recommendation to the President of INFCOM for approval.* +2.3.4.3 The president of INFCOM shall ensure the coordination and consultation necessary to confirm that the data are fit for purpose and authoritative and that the centre is able to share its data on WIS +2.3.4.4 Following completion of the coordination and consultation process referred to in 2.3.4.3, and having taken into account its outcome, the President of INFCOM may approve the candidate centre to operate as a DCPC. 2.3.5 *Designated Data Collection or Production Centres* -2.3.5.1 The list of DCPCs approved by Congress or the Executive Council is included in Appendix C to this Manual. Each DCPC entry includes the name of the associated GISC. +2.3.5.1 The Secretariat shall maintain and publish the list of designated DCPCs. Each DCPC entry includes the name of the associated GISC. === *2.4 PROCEDURE FOR DESIGNATING A GLOBAL INFORMATION SYSTEM CENTRE* === From c7f6feba3cdff6930192e25dcf0db256931b604f Mon Sep 17 00:00:00 2001 From: Haddouch Hassan <103424042+hhaddouch@users.noreply.github.com> Date: Mon, 6 Jul 2026 16:52:46 +0200 Subject: [PATCH 3/4] Remove WIS 2.0 migration requirements for NCs and DCPCs Removed migration requirements for NCs and DCPCs from WIS/GTS to WIS 2.0. --- manual/sections/part2.adoc | 3 +-- 1 file changed, 1 insertion(+), 2 deletions(-) diff --git a/manual/sections/part2.adoc b/manual/sections/part2.adoc index 091bc9c..bceedc5 100644 --- a/manual/sections/part2.adoc +++ b/manual/sections/part2.adoc @@ -16,7 +16,7 @@ 2.2.2.1 *Each WMO Member shall notify WMO of the current name and location of each of its centres that is to be designated as an NC. INFCOM, with the involvement of the relevant regional associations and the assistance of the WMO Secretariat, shall ensure that each centre so designated has the support of a GISC, a DCPC or another NC.* -2.2.2.2 *Each NC shall complete the migration from WIS/GTS to WIS 2.0 in order to be designated as a WIS 2.0 centre.* + 2.2.2.3 The Secretariat shall maintain and publish the list of designated NCs. Each NC entry includes the name of the associated GISC. 2.2.3 *Designated National Centres* @@ -37,7 +37,6 @@ *(2) Implementation of a WIS2 Node;* *(3) Designation as a DCPC.* -2.3.2.2 *Each DCPC shall complete the migration from WIS/GTS to WIS 2.0 in order to be designated as a WIS 2.0 DCPC centre and added to the list maintained and published by the Secretariat.* 2.3.3 *Service offer by a potential Data Collection or Production Centre* From 27c4a90af7f8a6ecd4e9f9a0521a3cedb3aad21c Mon Sep 17 00:00:00 2001 From: Haddouch Hassan <103424042+hhaddouch@users.noreply.github.com> Date: Mon, 6 Jul 2026 17:41:38 +0200 Subject: [PATCH 4/4] Update WIS2 Node implementation and approval process Clarified the requirements for candidate DCPCs to demonstrate data compliance and updated the approval process wording. --- manual/sections/part2.adoc | 4 ++-- 1 file changed, 2 insertions(+), 2 deletions(-) diff --git a/manual/sections/part2.adoc b/manual/sections/part2.adoc index bceedc5..fe9304a 100644 --- a/manual/sections/part2.adoc +++ b/manual/sections/part2.adoc @@ -48,9 +48,9 @@ 2.3.4.1 *The Member offering a DCPC shall register a WIS2 centre identifier and follow the procedure for implementing a WIS2 Node. Compliance with the WIS2 specification is assessed by the principal GISC as described in the Guide to WIS, Volume II.* -2.3.4.2 *After the candidate DCPC has successfully implemented a WIS2 Node, SC-IMT shall formulate a recommendation to the President of INFCOM for approval.* +2.3.4.2 *After the candidate DCPC has successfully implemented a WIS2 Node and demonstrated its ability to provide the required data and metadata in accordance with WIS2 requirements, SC-IMT shall formulate a recommendation to the President of INFCOM for approval.* 2.3.4.3 The president of INFCOM shall ensure the coordination and consultation necessary to confirm that the data are fit for purpose and authoritative and that the centre is able to share its data on WIS -2.3.4.4 Following completion of the coordination and consultation process referred to in 2.3.4.3, and having taken into account its outcome, the President of INFCOM may approve the candidate centre to operate as a DCPC. +2.3.4.4 Following successful completion of the coordination and consultation process referred to in 2.3.4.3, the President of INFCOM will approve the candidate centre to operate as a DCPC. 2.3.5 *Designated Data Collection or Production Centres*