-
Notifications
You must be signed in to change notification settings - Fork 107
Open
Description
Whitelee wind farm is only 539 MW in total, it appears as though there's double counting for the extension - i.e. GBR0002757 is already included in GBR0003981.
| gppd_idnr | name | capacity_mw | latitude | longitude | primary_fuel | other_fuel1 | |
|---|---|---|---|---|---|---|---|
| 24474 | GBR0003489 | Whitelee | 322 | 55.6812 | -4.2791 | Wind | nan |
| 24475 | GBR0003981 | Whitelee 2 | 217.02 | 55.6772 | -4.2868 | Wind | nan |
| 24476 | GBR0002757 | Whitelee Windfarm Extension phase 2 | 109 | 55.6394 | -4.3176 | Wind | nan |
Reactions are currently unavailable
Metadata
Metadata
Assignees
Labels
No labels