Fix: Synchronize acknowledged werks to slave sites in distributed WATO setup #25302
Triggered via pull request
February 12, 2025 16:40
Status
Failure
Total duration
1h 4m 25s
Artifacts
–
Annotations
8 errors
testing (Python formatting, test-format-python)
Process completed with exit code 2.
|
testing (Python unit tests, test-unit)
The job was canceled because "Python_formatting_test-fo" failed.
|
testing (Ruff lint tests, test-ruff)
The job was canceled because "Python_formatting_test-fo" failed.
|
testing (Ruff lint tests, test-ruff)
The operation was canceled.
|
testing (mypy tests, test-mypy-raw)
The job was canceled because "Python_formatting_test-fo" failed.
|
testing (mypy tests, test-mypy-raw)
The operation was canceled.
|
testing (Bandit tests, test-bandit)
The job was canceled because "Python_formatting_test-fo" failed.
|
testing (Bandit tests, test-bandit)
The operation was canceled.
|