Milestones
List view
This final sprint before the competition is all about ensuring everything is perfect and ready for prime time. Goals: - Conduct final end-to-end testing, including regression testing. - Complete all remaining documentation (user manuals, technical guides, release notes). - Perform final code reviews and ensure adherence to coding standards. - Prepare all necessary assets for competition (e.g., deployment scripts, final software builds). - Address any last-minute critical bugs or issues. Key Deliverables: Final tested software build, complete documentation package, competition-ready deployment.
Due by May 22, 2027This is a critical sprint for validating our software in a simulated environment and preparing for real-world testing. Goals: - Integrate the rover software with the simulator for extensive virtual testing. - Run comprehensive test scenarios within the simulator to identify edge cases and system failures. - Address any issues arising from simulator testing. - Begin preparing for hardware-in-the-loop (HIL) testing. Key Deliverables: Fully integrated simulator environment, detailed simulator test reports, readiness for HIL testing.
Due by May 8, 2027With the core system integrated, this sprint shifts focus to performance and stability. This is crucial for a reliable rover. Goals: - Optimize code for performance and efficiency across all subsystems. - Conduct thorough bug fixing based on testing feedback. - Refine existing features based on initial performance metrics. - Update technical documentation to reflect current system state. Key Deliverables: Optimized code commits, comprehensive bug fix logs, updated performance metrics.
Due by March 20, 2027Once core features are in place, this sprint is about integrating them and beginning your testing cycles. This early testing will help identify major issues before they become deeply embedded. Goals: - Integrate newly developed features with existing systems. - Conduct initial system-level testing to identify major bugs and integration issues. - Begin drafting essential documentation (e.g., user manuals for hardware integration, API documentation). - Address feedback from early internal testing. Key Deliverables: Integrated system build, initial test reports, draft documentation.
Due by January 16, 2027•0/5 issues closedThis sprint is our foundational period. Building on the previous year's work, focus on implementing critical new features and making any necessary architectural improvements. Goals: - Implement primary new features identified for the 2027 competition. - Review and refine existing software architecture for scalability and maintainability. - Set up and configure the development environment for the new team members. - Establish clear coding standards and documentation practices for the year. Key Deliverables: Updated architectural design document, initial versions of core features.
Due by October 31, 2026•0/2 issues closed