Implementation of Minimal Hockeypuck Charm #31
integration_test.yaml
on: pull_request
integration-tests
/
Plan
4s
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
integration-tests
/
Required Integration Test Status Checks
0s
Matrix: integration-tests / scan
Annotations
4 errors
integration-tests / Build charm (hockeypuck-k8s)
The process '/snap/bin/charmcraft' failed with exit code 1
|
integration-tests / Build rock (hockeypuck)
The job was canceled because "charm_hockeypuck-k8s_char" failed.
|
integration-tests / Build rock (hockeypuck)
The operation was canceled.
|
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
2025-01-29T16-29-44-8225__plan
|
343 Bytes |
|