Skip to content

Post-release preparation for codeql-cli-2.20.2

fbb7f0a
Select commit
Loading
Failed to load commit list.
Merged

Post-release preparation for codeql-cli-2.20.2 #18541

Post-release preparation for codeql-cli-2.20.2
fbb7f0a
Select commit
Loading
Failed to load commit list.
GitHub Advanced Security / CodeQL completed Jan 20, 2025 in 4s

3 configurations not found

Warning: Code scanning cannot determine the alerts introduced by this pull request, because 3 configurations present on refs/heads/main were not found:

Actions workflow (rust-analysis.yml)

  • ❓  .github/workflows/rust-analysis.yml:analyze/language:rust

Actions workflow (csv-coverage-metrics.yml)

  • ❓  .github/workflows/csv-coverage-metrics.yml:publish-csharp
  • ❓  .github/workflows/csv-coverage-metrics.yml:publish-java

View all branch alerts.