refactor(metrics): replace kratos metrics with otel metrics #5830
Annotations
10 errors
build & test (1.19.x)
missing go.sum entry for module providing package golang.org/x/sys/unix (imported by github.com/mattn/go-isatty); to add:
|
build & test (1.19.x)
missing go.sum entry for module providing package google.golang.org/protobuf/encoding/protojson (imported by github.com/go-kratos/kratos/v2/config); to add:
|
build & test (1.19.x)
missing go.sum entry for module providing package google.golang.org/protobuf/proto (imported by github.com/go-kratos/kratos/v2/config); to add:
|
build & test (1.19.x)
Process completed with exit code 2.
|
build & test (1.21.x)
The job was canceled because "_1_19_x" failed.
|
build & test (1.21.x)
The operation was canceled.
|
build & test (1.22.x)
The job was canceled because "_1_19_x" failed.
|
build & test (1.22.x)
The operation was canceled.
|
build & test (1.20.x)
The job was canceled because "_1_19_x" failed.
|
build & test (1.20.x)
The operation was canceled.
|