build: switch to ARM runners #191
Triggered via pull request
January 28, 2025 09:09
Status
Cancelled
Total duration
6m 19s
Artifacts
–
pull_request.yml
on: pull_request
Create Matrix
8s
Matrix: Armbian
Matrix: OPI
Annotations
21 errors and 1 warning
Armbian (orangepi4_lts_bookworm)
error! Exiting due to 'Docker installed but not usable' - not interactive, exiting immediately.
|
Armbian (orangepi4_lts_bookworm)
Exiting with error 43 at /home/runner/work/armbian-builds/armbian-builds/build/lib/functions/logging/traps.sh:1
|
Armbian (orangepi4_lts_bookworm)
Process completed with exit code 43.
|
OPI (orangepi_zero3_1500mb_bookworm)
Process completed with exit code 100.
|
OPI (orangepi_zero3_others_bookworm)
Process completed with exit code 100.
|
Armbian (rock_pi_4se_bookworm)
Canceling since a higher priority waiting request for 'ci-buildtrain-pr-refs/pull/58/merge-1' exists
|
Armbian (rock_pi_4se_bookworm)
The operation was canceled.
|
Armbian (orangepi3_lts_bookworm)
Canceling since a higher priority waiting request for 'ci-buildtrain-pr-refs/pull/58/merge-1' exists
|
Armbian (orangepi3_lts_bookworm)
The operation was canceled.
|
Armbian (orangepi_zero2w_bookworm)
Canceling since a higher priority waiting request for 'ci-buildtrain-pr-refs/pull/58/merge-1' exists
|
Armbian (orangepi_zero2w_bookworm)
The operation was canceled.
|
Armbian (orangepi_zero2_bookworm)
Canceling since a higher priority waiting request for 'ci-buildtrain-pr-refs/pull/58/merge-1' exists
|
Armbian (orangepi_zero2_bookworm)
The operation was canceled.
|
Armbian (bananapi_m2_zero_bookworm)
Canceling since a higher priority waiting request for 'ci-buildtrain-pr-refs/pull/58/merge-1' exists
|
Armbian (bananapi_m2_zero_bookworm)
The operation was canceled.
|
Armbian (bigtreetech_cb1_bullseye)
Canceling since a higher priority waiting request for 'ci-buildtrain-pr-refs/pull/58/merge-1' exists
|
Armbian (bigtreetech_cb1_bullseye)
The operation was canceled.
|
Armbian (bigtreetech_cb1_bookworm)
Canceling since a higher priority waiting request for 'ci-buildtrain-pr-refs/pull/58/merge-1' exists
|
Armbian (bigtreetech_cb1_bookworm)
The operation was canceled.
|
Armbian (rock_cm3_bookworm)
Canceling since a higher priority waiting request for 'ci-buildtrain-pr-refs/pull/58/merge-1' exists
|
Armbian (rock_cm3_bookworm)
The operation was canceled.
|
Armbian (orangepi4_lts_bookworm)
Docker is installed, but not usable can't use Docker; check your Docker config / groups / etc
|