Skip to content

skkuse-adv/2019Fall_team2

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

57 Commits
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

Team2 Logo

Gitter GitHub repo size GitHub issues GitHub pull requests GitHub contributors

Introduction

  • The major goal of this team project is to generate enhanced architecture desigin finally after executing the below steps.
    • Choose one among popular target systems (e.g., personnalization)
    • Milestone: https://github.com/skkuse-adv/2019Fall_team2/milestones
      • 👔 Milestone 1: Write the proposal document after analyzing briefly target system
      • 👔 Milestone 2: Write the system requirement document for a requirement specification
      • 👔 Milestone 3: Write the system design document for a target system architecture
      • 👔 Milestone 4: Write the enhanced system design based on ADD to propose new architecture model finally.

Members

Full Name GitHub ID E-mail R&R
beandkay [email protected] Design, Analysis, Documentation, System Requirement, Review Input, ADD-iteration3, GitHub Issue, Review&Merging
임근식 leemgs [email protected] Design, Analysis, Documentation, Reverse Engineering, Design Purpose,ADD-iteration1&2, Review&Merging
하지크 ajid951125 [email protected] Design, Analysis, Documentation, System Requirement, ADD-iteration4, Review&Merging
장한빈 JangHanBin [email protected] -

Repository Structure

PROJECT ROOT
.
|-- README.md (This file)
|-- analysis (decompiling the mobile applications, Generating pseudo codes, Restoring resource files, and so on)
|   `-- reverse-engineering
|       |-- decompile-fitts-20191031-2200 (Resource-based decompilation)
|       |   |-- resources
|       |   `-- sources
|       `-- decompile-fitts-with-gradle-20191031-2200 (Gradle-based decompilation)
|           |-- build.gradle
|           `-- src
|
 `-- docs
     `-- Milestone1: Proposal.pptx  
     `-- Milestone2: Requirement Specification.docx 
     `-- Milestone3: System Design.docx
     `-- Milestone4: ADD Iteration Final.docx (ADD-based Architecture Model) 

Terminology

  • SD: System Design
  • TBA: To Be Appended
  • TBD: To Be Defined
  • WIP: Work-In-Progress
  • M: Milestone (e.g., M1, M2, M3, and M4)

About

👔 Team2 Repository for enhancing the Fitts (https://fitts.co.kr) system

Resources

License

Code of conduct

Stars

Watchers

Forks

Releases

No releases published

Packages

 
 
 

Contributors

Languages