BLCC to E3 Conversion - For projects with a PCPeriod/Construction Period, initial occurrence values must be adjusted by the length of the construction period #185

Closed
jkneifel opened this issue Feb 26, 2025 · 0 comments
Assignees

Comments

@jkneifel
Copy link
Collaborator

jkneifel commented Feb 26, 2025

Use MilconFEMP example file as an example.
This needs to be done for all OMR, replacement, contract, and other costs.
A different issue will clarify that Initial occurrence is number of years from service date.
The value inputted needs to be adjusted in the BLCC to E3 conversion to ensure the year of the study period is correct.
For example, if the construction phase is 2 years and the initial occurrence is 10 years after the start date, then the year in the study period would be 12. The same issue has been identified for other costs (i.e., energy) in a separate issue #94 .

@jkneifel jkneifel changed the title Upload Existing File - For projects with a PCPeriod/Construction Period, the initial occurrence values must be adjusted by the length of the construction period BLCC to E3 Conversion - For projects with a PCPeriod/Construction Period, initial occurrence values must be adjusted by the length of the construction period Feb 28, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Projects
None yet
Development

No branches or pull requests

3 participants