Skip to content

Merge pull request #27 from JMUWRobotics/icpFixpoint_dev #85

Merge pull request #27 from JMUWRobotics/icpFixpoint_dev

Merge pull request #27 from JMUWRobotics/icpFixpoint_dev #85

Triggered via push September 4, 2025 12:16
Status Failure
Total duration 18s
Artifacts

main.yml

on: push
Matrix: linux
Fit to window
Zoom out
Zoom in

Annotations

11 errors
linux (debian:buster)
Process completed with exit code 100.
linux (ubuntu:jammy)
The operation was canceled.
linux (ubuntu:jammy)
The strategy configuration was canceled because "linux.debian_buster" failed
linux (debian:bullseye)
The operation was canceled.
linux (debian:bullseye)
The strategy configuration was canceled because "linux.debian_buster" failed
linux (ubuntu:focal)
The operation was canceled.
linux (ubuntu:focal)
The strategy configuration was canceled because "linux.debian_buster" failed
linux (ubuntu:bionic)
The operation was canceled.
linux (ubuntu:bionic)
The strategy configuration was canceled because "linux.debian_buster" failed
linux (ubuntu:noble)
The operation was canceled.
linux (ubuntu:noble)
The strategy configuration was canceled because "linux.debian_buster" failed